Case study · AI agents · Fabrication

Material takeoffs in minutes for a New Brunswick cladding fabricator

Estimators counted cladding panels on drawings by hand, and bid invitations piled up in email, just as the company needed to win work in new markets. We built an AI agent that produces the full material takeoff from drawings and specs, and a sales agent that turns every bid invitation into one tracked deal.

About the Client

A New Brunswick custom fabrication and construction management firm that designs, fabricates and installs aluminum composite material (ACM) cladding panels, with its own CNC panel line. With US work slowing because of trade conditions, the company set out to find and win more projects in other provinces and international markets. Part of the project was funded through Digital Boost 3.0.

Material takeoffs in minutes for a New Brunswick cladding fabricator
AI agent workflow features for automated cladding panel counting

The Challenge

Takeoffs by hand
For every bid, an estimator went through the drawings elevation by elevation, counting and measuring panels by type, working out hardware and adding waste. On a tight deadline, that limited how many projects the team could price.
Bid invitations scattered in email
Invitations, addenda and reminders arrived from many general contractors. With no structured tracking, the same project could be missed or followed up twice, and leadership had no clear view of the pipeline.

What we built

Two agents: one for estimating, one for sales

1. Quantity takeoff and estimating agent

The agent reads the project’s drawings and specifications and counts every panel by profile, the way the estimating team labels them.

F Flat panels
C U-shape panels
L L-shape panels
OutputWhat the estimator gets
QuantitiesACM quantities by elevation
Panel countsFlat, U-shape and L-shape panels for each elevation
HardwareDerived from the panel layout
WasteWaste factors applied to the material quantities
Review checklistDiscrepancies between drawings and specs, flagged for review
EstimateA priced estimate from the takeoff and past job costs
  • The estimator’s job changes from building the takeoff to checking it.
  • Runs on Teckels AI, our AI agent platform, so the team uses it on every bid, not as a one-off prototype.
  • We’re refining the output with the estimating team on live bids.

2. Sales agent and CRM pipeline

  • A Pipedrive CRM with stages that match how the company bids, from first invitation through bid submitted to won or lost.
  • The agent reads bid invitations, addenda and reminders from email and logs each project as a deal in the right pipeline.
  • When an addendum or reminder arrives for a project already in the CRM, the agent adds a note to the existing deal instead of creating a new one.
  • Leadership sees every active bid in one place, sorted by the company’s own quote numbers.
23 > 1
One deal: Transit terminal project
Invitations, addenda and reminders as notes on a single deal. Before the fix, it showed up as 23 separate deals.

Results

Faster takeoffs, a pipeline you can see

Minutes
for a full material takeoff from drawings and specs, work that took an estimator hours
23 > 1
duplicate deals for one project merged into a single deal
3
panel types counted automatically on every elevation
  • A full material takeoff in minutes. Tested on a real public-sector project’s drawings and specifications, the agent produced quantities by elevation, panel counts, hardware and waste in minutes, work that normally takes an estimator hours.
  • Every bid invitation tracked. Invitations, addenda and reminders land in the CRM automatically, with one deal per project.
  • A repeatable process instead of memory. Estimating and bid tracking now follow a documented workflow the company can take into new markets.

Tools and integrations

  • Teckels AI agent platform
  • Drawing and specification PDFs
  • Pipedrive CRM
  • Microsoft 365 email
  • Digital Boost 3.0 funding

Check our recent work here

Material takeoffs in minutes for a New Brunswick cladding fabricator Material takeoffs in minutes for a New Brunswick cladding fabricator
10–15 hours a week back for a New Brunswick general contractor 10–15 hours a week back for a New Brunswick general contractor
From Manual Chaos to Automated Growth From Manual Chaos to Automated Growth
QuestJobs × Let’s Nurture QuestJobs × Let’s Nurture
AI-Powered Draw-to-Life Event Experience AI-Powered Draw-to-Life Event Experience
KitchenFarms × Let’s Nurture KitchenFarms × Let’s Nurture